As the phrase goes,”Many hands make light work” well it wouldn’t have been possible to install the first frame on Marsden Moor without a crane attached to the transport vehicle. Hoisted into place and then lowered the frame was installed. Final work included placing screws through the flanges and soldering them in to place. The unearthed surrounding ground was then moved manually back into place and the first frame was installed. From paper to installation the first frame is now in place at Wessenden Head, Marsden Moor.